O`HAKO RESIDENSI PROJECT
38-storey high-rise condominium (5-level basement & 33-level condominium).
Japanese developer/owner, local main contractor
Transfer PT slab with 1.4M floor concrete thickness of RC structure
Plus PM Consultant supports in condominium and township development in ASEAN region targeting good results from planning, building cost reduction and zero complaints after completion.
Real estate developers have been focusing on the location, design, price and layout of the property. Consumers have now entered into the era of pursuing high-quality living with minimum problems after handover. Even from the Developer side, water leaking problem or facility malfunction after completion of the building will worsen the handover process.
In order to make project plan with less problem after completion, it is important to check detailed specifications and select appropriate equipment at design stage, study of detailing and proper construction method.
Condominium(718 units)
GFA
Approx. 167,554m²
Detached Houses (Total 100 units)
GFA
Approx. 53,000m²
Common Housing (Total 358 units)
GFA
Approx. 31,000m²