{"id":16792,"date":"2021-07-21T18:34:55","date_gmt":"2021-07-21T10:34:55","guid":{"rendered":"http:\/\/staging.plus-pm.com\/blog\/factory-construction\/"},"modified":"2023-01-11T10:20:19","modified_gmt":"2023-01-11T02:20:19","slug":"factory-construction","status":"publish","type":"blog","link":"http:\/\/staging.plus-pm.com\/en\/blog\/factory-construction\/","title":{"rendered":"Manufacturing engineering and Factory Construction management"},"content":{"rendered":"\n<h3 class=\"has-background wp-block-heading\" style=\"background-color:#0142b1\"><strong><span class=\"has-inline-color has-white-color\">You may have these concerns about factory\u2026<\/span><\/strong><\/h3>\n\n\n\n<h4 class=\"wp-block-heading\"><strong><span class=\"has-inline-color has-vivid-cyan-blue-color\"><strong> <strong><span class=\"has-inline-color has-vivid-cyan-blue-color\"><strong>\u201c<\/strong><\/span><\/strong>How to harmonize factory design and production process\u201d<\/strong><\/span><\/strong><\/h4>\n\n\n\n<h4 class=\"wp-block-heading\"><strong><span class=\"has-inline-color has-vivid-cyan-blue-color\"><strong>\u201cHow to optimize workflow and improve productivity\u201d<\/strong><\/span><\/strong><\/h4>\n\n\n\n<h4 class=\"wp-block-heading\"><strong><span class=\"has-inline-color has-vivid-cyan-blue-color\"><strong>\u201cHow to have a safe factory\u201d<\/strong><\/span><\/strong><\/h4>\n\n\n\n<h4 class=\"wp-block-heading\"> <strong><span class=\"has-inline-color has-vivid-cyan-blue-color\"><strong><strong><span class=\"has-inline-color has-vivid-cyan-blue-color\"><strong>\u201c<\/strong><\/span><\/strong><\/strong><\/span><\/strong><strong><span class=\"has-inline-color has-vivid-cyan-blue-color\"><strong>Being concerned about long-term planning\u201d<\/strong><\/span><\/strong> <\/h4>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>These are the major issues in construction of factories.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>Many companies entering the ASEAN market and build their factories for a variety of reasons which include market development, production cost reduction, restructuring of the supply chain for parts and products, requests from Client and the launch of new businesses.<\/p>\n\n\n\n<p><strong><span class=\"has-inline-color has-vivid-cyan-blue-color\"><a href=\"http:\/\/staging.plus-pm.com\/en\/\" target=\"_blank\" rel=\"noreferrer noopener\">Plus PM Consultant Sdn Bhd<\/a><\/span><\/strong>, Construction Project Management Consultant, has reliable staff who are familiar with ASEAN construction situation is capable of providing detailed service and support the companies considering business development in Malaysia, Vietnam, and Indonesia.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h4 class=\"wp-block-heading\"><strong><strong>Please feel free to contact us if you have any questions about construction projects or our services.<\/strong><\/strong><\/h4>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"http:\/\/staging.plus-pm.com\/en\/contact\/\" target=\"_blank\" rel=\"noopener\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"401\" src=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam-1024x401.png\" alt=\"Industrial and Factory Construction and Project management\uff5c For Malaysia, Indonesia, and Vietnam\" class=\"wp-image-16826\" srcset=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam-1024x401.png 1024w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam-300x118.png 300w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam-768x301.png 768w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam-1536x602.png 1536w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam-2048x802.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<div style=\"height:70px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity\"\/>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"has-text-align-center has-black-color has-text-color wp-block-heading\"><strong>Information about our Service<\/strong><\/h2>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"has-black-color has-pale-cyan-blue-background-color has-text-color has-background wp-block-heading\"><strong><strong>Total support from business start-up to operation<\/strong><\/strong><\/h3>\n\n\n\n<p>We offer total management services from the project start-up phase to post-completion operations. We also provide best solution based on characteristics of the project at any phase of the Client\u2019s project even from the middle of the project.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><a href=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-Total-support-from-business-start-up-to-operation.png\"><img decoding=\"async\" width=\"1024\" height=\"555\" src=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-Total-support-from-business-start-up-to-operation-1024x555.png\" alt=\"Industrial and Factory Construction and Project management\uff5c Total support from business start-up to operation\" class=\"wp-image-16830\" srcset=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-Total-support-from-business-start-up-to-operation-1024x555.png 1024w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-Total-support-from-business-start-up-to-operation-300x163.png 300w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-Total-support-from-business-start-up-to-operation-768x416.png 768w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-Total-support-from-business-start-up-to-operation-1536x833.png 1536w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-Total-support-from-business-start-up-to-operation-2048x1111.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p class=\"has-text-align-center has-small-font-size\">\u25b2Click to zoom<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"has-black-color has-pale-cyan-blue-background-color has-text-color has-background wp-block-heading\"><strong>As an ASEAN construction experts<\/strong><\/h3>\n\n\n\n<p>In order to proceed ASEAN projects smoothly, it is important to consider countermeasures in advance for any unique problems that may arise, using construction technology while understanding the local culture and customs. <\/p>\n\n\n\n<p>Another characteristic of factory construction projects is that there is a wide range of people involved in the project, including not only the facilities department, but also the local manufacturing and production technology departments, the corporate planning and finance departments, and the headquarters management team.<\/p>\n\n\n\n<p>With the purpose to achieve our Client\u2019s project goals we provide smooth project management and support as \u201cConstruction project expertise who are always stand by the Client\u201d We verify proposals, design drawings, and estimates from designers, construction companies, vendors, and consultants, and implement management (quality, cost, schedule, and delivery) to maximize Client benefits.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><a href=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management-For-Malaysia-Indonesia-and-Vietnam_organization-Structure.png\"><img decoding=\"async\" width=\"1024\" height=\"434\" src=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management-For-Malaysia-Indonesia-and-Vietnam_organization-Structure-1024x434.png\" alt=\"Industrial and Factory Construction and Project management For Malaysia, Indonesia, and Vietnam organization Structure\" class=\"wp-image-16825\" srcset=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management-For-Malaysia-Indonesia-and-Vietnam_organization-Structure-1024x434.png 1024w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management-For-Malaysia-Indonesia-and-Vietnam_organization-Structure-300x127.png 300w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management-For-Malaysia-Indonesia-and-Vietnam_organization-Structure-768x326.png 768w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management-For-Malaysia-Indonesia-and-Vietnam_organization-Structure-1536x652.png 1536w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management-For-Malaysia-Indonesia-and-Vietnam_organization-Structure-2048x869.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p class=\"has-text-align-center has-small-font-size\">\u25b2Click to zoom<\/p>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"has-black-color has-pale-cyan-blue-background-color has-text-color has-background wp-block-heading\"><strong><strong>Highly accurate Basic Planning<\/strong><\/strong><\/h3>\n\n\n\n<p><strong><strong>How should we proceed with the project in order to achieve a factory that harmonizes factory design and production process where there is no waste in flow lines?<\/strong><\/strong><\/p>\n\n\n\n<p>Our solutions are to <strong>understand the current issues, set goals and objectives, and have a highly accurate Basic Plan<\/strong>. By improving the accuracy of the Basic Plan, we can minimize the risk of rework in the subsequent design and construction processes, ensure the functional quality of the factory, and control costs. Foreseeing from the design phase, until construction and operation stage is the quickest way to achieve a plan without any of waste.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong><span class=\"has-inline-color has-vivid-cyan-blue-color\"><strong>Basic Plan Formulation Flow<\/strong><\/span><\/strong><\/h4>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><a href=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam_Basic-Plan-Formulation-Flow.png\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"256\" src=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam_Basic-Plan-Formulation-Flow-1024x256.png\" alt=\"Industrial and Factory Construction and Project management\uff5c For Malaysia, Indonesia, and Vietnam_ Basic Plan Formulation Flow\" class=\"wp-image-16827\" srcset=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam_Basic-Plan-Formulation-Flow-1024x256.png 1024w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam_Basic-Plan-Formulation-Flow-300x75.png 300w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam_Basic-Plan-Formulation-Flow-768x192.png 768w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam_Basic-Plan-Formulation-Flow-1536x383.png 1536w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam_Basic-Plan-Formulation-Flow-2048x511.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p class=\"has-text-align-center has-small-font-size\">\u25b2Click to zoom<\/p>\n\n\n\n<div style=\"height:35px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n<\/div>\n\n\n\n<h4 class=\"wp-block-heading\"><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-cyan-blue-color\"><strong><strong>Output image at the Basic Planning Stage<\/strong><\/strong><\/mark><\/h4>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"has-text-align-left has-small-font-size\"><strong>\uff5c<span class=\"has-inline-color has-black-color\"> <strong>Production Flow Diagram<\/strong><\/span><\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"400\" src=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/\u751f\u7523\u30d5\u30ed\u30fc_factory-construction_Plus-PM-Consultant.jpg\" alt=\"\u751f\u7523\u30d5\u30ed\u30fc_factory-construction_Plus PM Consultant\" class=\"wp-image-16813\" srcset=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/\u751f\u7523\u30d5\u30ed\u30fc_factory-construction_Plus-PM-Consultant.jpg 600w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/\u751f\u7523\u30d5\u30ed\u30fc_factory-construction_Plus-PM-Consultant-300x200.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"has-text-align-left has-small-font-size\"><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-black-color\"><strong>\uff5c <strong>Layout Plan Comparison<\/strong><\/strong><\/mark><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"389\" src=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/\u914d\u7f6e\u8a08\u753b\u6bd4\u8f03\u7528_factory-construction_Plus-PM-Consultant.jpg\" alt=\"\u914d\u7f6e\u8a08\u753b\u6bd4\u8f03\u7528_factory-construction_Plus PM Consultant\" class=\"wp-image-16812\" srcset=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/\u914d\u7f6e\u8a08\u753b\u6bd4\u8f03\u7528_factory-construction_Plus-PM-Consultant.jpg 600w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/\u914d\u7f6e\u8a08\u753b\u6bd4\u8f03\u7528_factory-construction_Plus-PM-Consultant-300x195.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"has-text-align-left has-small-font-size\"><strong><span class=\"has-inline-color has-black-color\">\uff5c <strong>Project Budget and Construction Cost Estimate<\/strong><\/span><\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1040\" height=\"720\" src=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/\u4e8b\u696d\u5168\u4f53\u4e88\u7b97\u8868_factory-construction_Plus-PM-Consultant.jpg\" alt=\"\u4e8b\u696d\u5168\u4f53\u4e88\u7b97\u8868_factory-construction_Plus PM Consultant\" class=\"wp-image-16797\" srcset=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/\u4e8b\u696d\u5168\u4f53\u4e88\u7b97\u8868_factory-construction_Plus-PM-Consultant.jpg 1040w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/\u4e8b\u696d\u5168\u4f53\u4e88\u7b97\u8868_factory-construction_Plus-PM-Consultant-300x208.jpg 300w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/\u4e8b\u696d\u5168\u4f53\u4e88\u7b97\u8868_factory-construction_Plus-PM-Consultant-1024x709.jpg 1024w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/\u4e8b\u696d\u5168\u4f53\u4e88\u7b97\u8868_factory-construction_Plus-PM-Consultant-768x532.jpg 768w\" sizes=\"(max-width: 1040px) 100vw, 1040px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"has-text-align-left has-small-font-size\"><strong>\uff5c <strong>Overall project schedule<\/strong><\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"404\" src=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/\u30d7\u30ed\u30b8\u30a7\u30af\u30c8\u30b9\u30b1\u30b8\u30e5\u30fc\u30eb_factory-construction_Plus-PM-Consultant-2.jpg\" alt=\"\u30d7\u30ed\u30b8\u30a7\u30af\u30c8\u30b9\u30b1\u30b8\u30e5\u30fc\u30eb_factory-construction_Plus PM Consultant\" class=\"wp-image-16814\" srcset=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/\u30d7\u30ed\u30b8\u30a7\u30af\u30c8\u30b9\u30b1\u30b8\u30e5\u30fc\u30eb_factory-construction_Plus-PM-Consultant-2.jpg 600w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/\u30d7\u30ed\u30b8\u30a7\u30af\u30c8\u30b9\u30b1\u30b8\u30e5\u30fc\u30eb_factory-construction_Plus-PM-Consultant-2-300x202.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"has-black-color has-pale-cyan-blue-background-color has-text-color has-background wp-block-heading\"><strong><strong><strong><strong>Procurement Strategy Planning and Cost Management<\/strong><\/strong><\/strong><\/strong><\/h3>\n\n\n\n<p><strong><strong>When developing a project policy, it is important to formulate the procurement strategy.<\/strong><\/strong><\/p>\n\n\n\n<p>The Tender and procurement phase is very important to control risks, this includes discussing and negotiating contract details with designers and construction companies. In the case of production facilities, <strong>determining when to make a final decision on construction companies and machinery vendors <\/strong>is critical in order to make a risk balance in cost and schedule<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><a href=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam_procurement.png\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"538\" src=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam_procurement-1024x538.png\" alt=\"Industrial and Factory Construction and Project management\uff5c For Malaysia, Indonesia, and Vietnam_ procurement\" class=\"wp-image-16829\" srcset=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam_procurement-1024x538.png 1024w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam_procurement-300x158.png 300w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam_procurement-768x404.png 768w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam_procurement-1536x808.png 1536w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam_procurement-2048x1077.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p class=\"has-text-align-center has-small-font-size\"> \u25b2Click to zoom <\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p>We provide various procurement methods. These include the conventional separate order system for design and construction, the Design&amp; Build order system for design and construction in which the basic design is ordered to a design company and the implementation design and construction are collectively ordered to a general contractor, and the lump-sum order system for design and construction in which the entire process from basic design to construction is ordered to a general contractor, and engineering.<\/p>\n<\/div>\n<\/div>\n\n\n\n<p>Each ordering method has its own advantages and disadvantages. The characteristics of each ordering method vary depending on the laws and regulations of each country. We can help you decide on a strategy that optimizes cost, quality, schedule, and risk according to the characteristics of your project.<\/p>\n\n\n\n<div style=\"height:40px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>And,<\/p>\n\n\n\n<h5 class=\"wp-block-heading\"><strong><span class=\"has-inline-color has-vivid-cyan-blue-color\"><strong>Cost Management is still one of the most important factors for the success of a project.<\/strong><\/span><\/strong><\/h5>\n\n\n\n<p>We aim to complete projects within the budget by making accurate estimates in the basic planning stage, constantly managing items that affect costs in the design and construction stages, and visualizing cost trends.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"604\" src=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam_cost-managemnet-1024x604.png\" alt=\"Industrial and Factory Construction and Project management\uff5c For Malaysia, Indonesia, and Vietnam_ cost management\" class=\"wp-image-16828\" srcset=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam_cost-managemnet-1024x604.png 1024w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam_cost-managemnet-300x177.png 300w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam_cost-managemnet-768x453.png 768w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam_cost-managemnet-1536x906.png 1536w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam_cost-managemnet-2048x1208.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n<\/div>\n\n\n\n<h3 class=\"has-black-color has-pale-cyan-blue-background-color has-text-color has-background wp-block-heading\"><strong>Achievement in Industrial and Factory construction<\/strong><\/h3>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><a href=\"http:\/\/staging.plus-pm.com\/en\/project\/toyo-tyre-malaysia-new-factory-phase-2-project\/\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"575\" src=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/08\/toyo-tyre-scaled-2-1024x575.jpg\" alt=\"\" class=\"wp-image-16666\" srcset=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/08\/toyo-tyre-scaled-2-1024x575.jpg 1024w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/08\/toyo-tyre-scaled-2-300x169.jpg 300w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/08\/toyo-tyre-scaled-2-768x432.jpg 768w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/08\/toyo-tyre-scaled-2-1536x863.jpg 1536w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/08\/toyo-tyre-scaled-2.jpg 1881w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p class=\"has-text-align-center has-small-font-size\">  \u25b2Read more <\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h6 class=\"wp-block-heading\">Industrial and warehouse in Malaysia<\/h6>\n\n\n\n<p><strong><a href=\"http:\/\/staging.plus-pm.com\/en\/project\/toyo-tyre-malaysia-new-factory-phase-2-project\/\" target=\"_blank\" rel=\"noreferrer noopener\">TOYO TYRE MALAYSIA New Factory (Phase 2) Project<\/a><\/strong><\/p>\n\n\n\n<p class=\"has-small-font-size\">This project is the Phase-2 expansion of the production capacity of TOYO TYRE MALAYSIA with over 100,000 m\u00b2 floor expansion and renovation.&nbsp;<\/p>\n<\/div>\n<\/div>\n\n\n\n<p><\/p>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><a href=\"http:\/\/staging.plus-pm.com\/en\/project\/taisei-lamick-factory-office-project\/\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Taisei-Lamick-FactoryOffice-Project\u6d77\u5916\u5de5\u5834\u5efa\u8a2d\u652f\u63f4\uff5c\u5efa\u8a2d\u30b3\u30f3\u30b5\u30eb\u30bf\u30f3\u30c8\uff5c\u30de\u30ec\u30fc\u30b7\u30a2\u5de5\u5834\u30fb\u30a4\u30f3\u30c9\u30cd\u30b7\u30a2\u5de5\u5834\u30fb\u30d9\u30c8\u30ca\u30e0\u5de5\u5834-1024x768.jpg\" alt=\"\" class=\"wp-image-16815\" srcset=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Taisei-Lamick-FactoryOffice-Project\u6d77\u5916\u5de5\u5834\u5efa\u8a2d\u652f\u63f4\uff5c\u5efa\u8a2d\u30b3\u30f3\u30b5\u30eb\u30bf\u30f3\u30c8\uff5c\u30de\u30ec\u30fc\u30b7\u30a2\u5de5\u5834\u30fb\u30a4\u30f3\u30c9\u30cd\u30b7\u30a2\u5de5\u5834\u30fb\u30d9\u30c8\u30ca\u30e0\u5de5\u5834-1024x768.jpg 1024w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Taisei-Lamick-FactoryOffice-Project\u6d77\u5916\u5de5\u5834\u5efa\u8a2d\u652f\u63f4\uff5c\u5efa\u8a2d\u30b3\u30f3\u30b5\u30eb\u30bf\u30f3\u30c8\uff5c\u30de\u30ec\u30fc\u30b7\u30a2\u5de5\u5834\u30fb\u30a4\u30f3\u30c9\u30cd\u30b7\u30a2\u5de5\u5834\u30fb\u30d9\u30c8\u30ca\u30e0\u5de5\u5834-300x225.jpg 300w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Taisei-Lamick-FactoryOffice-Project\u6d77\u5916\u5de5\u5834\u5efa\u8a2d\u652f\u63f4\uff5c\u5efa\u8a2d\u30b3\u30f3\u30b5\u30eb\u30bf\u30f3\u30c8\uff5c\u30de\u30ec\u30fc\u30b7\u30a2\u5de5\u5834\u30fb\u30a4\u30f3\u30c9\u30cd\u30b7\u30a2\u5de5\u5834\u30fb\u30d9\u30c8\u30ca\u30e0\u5de5\u5834-768x576.jpg 768w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Taisei-Lamick-FactoryOffice-Project\u6d77\u5916\u5de5\u5834\u5efa\u8a2d\u652f\u63f4\uff5c\u5efa\u8a2d\u30b3\u30f3\u30b5\u30eb\u30bf\u30f3\u30c8\uff5c\u30de\u30ec\u30fc\u30b7\u30a2\u5de5\u5834\u30fb\u30a4\u30f3\u30c9\u30cd\u30b7\u30a2\u5de5\u5834\u30fb\u30d9\u30c8\u30ca\u30e0\u5de5\u5834-1536x1152.jpg 1536w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Taisei-Lamick-FactoryOffice-Project\u6d77\u5916\u5de5\u5834\u5efa\u8a2d\u652f\u63f4\uff5c\u5efa\u8a2d\u30b3\u30f3\u30b5\u30eb\u30bf\u30f3\u30c8\uff5c\u30de\u30ec\u30fc\u30b7\u30a2\u5de5\u5834\u30fb\u30a4\u30f3\u30c9\u30cd\u30b7\u30a2\u5de5\u5834\u30fb\u30d9\u30c8\u30ca\u30e0\u5de5\u5834-2048x1536.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">DCIM\/172MEDIA\/DJI_0001.JPG<\/figcaption><\/figure>\n\n\n\n<p class=\"has-text-align-center has-small-font-size\">  \u25b2Read more <\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h6 class=\"wp-block-heading\"> Industrial and warehouse in Malaysia <\/h6>\n\n\n\n<p><strong><a href=\"http:\/\/staging.plus-pm.com\/en\/project\/taisei-lamick-factory-office-project\/\" target=\"_blank\" rel=\"noreferrer noopener\">Taisei Lamick Factory\/Office Project<\/a><\/strong><\/p>\n\n\n\n<p class=\"has-small-font-size\">A factory project of 23,000m\u00b2 by Malaysia Packaging Industry Berhad, the Malaysia subsidiary of Taisei Lamic Co., Ltd. A high level of both technology and knowledge are required at the scale similar to a plant. Plus PM provides detailed management with a team of mainly mechanical &amp; electrical engineers to realize a precise design and construction by local contractor.<\/p>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><a href=\"http:\/\/staging.plus-pm.com\/en\/project\/synergy-factory-project\/\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/SYNERGY-Factory-Project\u6d77\u5916\u5de5\u5834\u5efa\u8a2d\u652f\u63f4\uff5c\u5efa\u8a2d\u30b3\u30f3\u30b5\u30eb\u30bf\u30f3\u30c8\uff5c\u30de\u30ec\u30fc\u30b7\u30a2\u5de5\u5834\u30fb\u30a4\u30f3\u30c9\u30cd\u30b7\u30a2\u5de5\u5834\u30fb\u30d9\u30c8\u30ca\u30e0\u5de5\u5834-1024x768.jpg\" alt=\"\" class=\"wp-image-16817\" srcset=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/SYNERGY-Factory-Project\u6d77\u5916\u5de5\u5834\u5efa\u8a2d\u652f\u63f4\uff5c\u5efa\u8a2d\u30b3\u30f3\u30b5\u30eb\u30bf\u30f3\u30c8\uff5c\u30de\u30ec\u30fc\u30b7\u30a2\u5de5\u5834\u30fb\u30a4\u30f3\u30c9\u30cd\u30b7\u30a2\u5de5\u5834\u30fb\u30d9\u30c8\u30ca\u30e0\u5de5\u5834-1024x768.jpg 1024w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/SYNERGY-Factory-Project\u6d77\u5916\u5de5\u5834\u5efa\u8a2d\u652f\u63f4\uff5c\u5efa\u8a2d\u30b3\u30f3\u30b5\u30eb\u30bf\u30f3\u30c8\uff5c\u30de\u30ec\u30fc\u30b7\u30a2\u5de5\u5834\u30fb\u30a4\u30f3\u30c9\u30cd\u30b7\u30a2\u5de5\u5834\u30fb\u30d9\u30c8\u30ca\u30e0\u5de5\u5834-300x225.jpg 300w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/SYNERGY-Factory-Project\u6d77\u5916\u5de5\u5834\u5efa\u8a2d\u652f\u63f4\uff5c\u5efa\u8a2d\u30b3\u30f3\u30b5\u30eb\u30bf\u30f3\u30c8\uff5c\u30de\u30ec\u30fc\u30b7\u30a2\u5de5\u5834\u30fb\u30a4\u30f3\u30c9\u30cd\u30b7\u30a2\u5de5\u5834\u30fb\u30d9\u30c8\u30ca\u30e0\u5de5\u5834-768x576.jpg 768w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/SYNERGY-Factory-Project\u6d77\u5916\u5de5\u5834\u5efa\u8a2d\u652f\u63f4\uff5c\u5efa\u8a2d\u30b3\u30f3\u30b5\u30eb\u30bf\u30f3\u30c8\uff5c\u30de\u30ec\u30fc\u30b7\u30a2\u5de5\u5834\u30fb\u30a4\u30f3\u30c9\u30cd\u30b7\u30a2\u5de5\u5834\u30fb\u30d9\u30c8\u30ca\u30e0\u5de5\u5834-1536x1152.jpg 1536w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/SYNERGY-Factory-Project\u6d77\u5916\u5de5\u5834\u5efa\u8a2d\u652f\u63f4\uff5c\u5efa\u8a2d\u30b3\u30f3\u30b5\u30eb\u30bf\u30f3\u30c8\uff5c\u30de\u30ec\u30fc\u30b7\u30a2\u5de5\u5834\u30fb\u30a4\u30f3\u30c9\u30cd\u30b7\u30a2\u5de5\u5834\u30fb\u30d9\u30c8\u30ca\u30e0\u5de5\u5834-2048x1536.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">OLYMPUS DIGITAL CAMERA<\/figcaption><\/figure>\n\n\n\n<p class=\"has-text-align-center has-small-font-size\"> \u25b2Read more<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h6 class=\"wp-block-heading\">  Factory and manufacturing in Malaysia  <\/h6>\n\n\n\n<p><strong><a href=\"http:\/\/staging.plus-pm.com\/en\/project\/synergy-factory-project\/\" target=\"_blank\" rel=\"noreferrer noopener\">SYNERGY Factory Project<\/a><\/strong><\/p>\n\n\n\n<p class=\"has-small-font-size\">This is a factory project for automobile steel pipe processing. Due to client\u2019s concern of ordering the work to local contractor, Plus PM was requested to implement construction management work. For cost reduction and quality assurance, we introduced NSC contract (cost on order method in Japan) and progress payment that on-site progress evaluation by Plus PM. This has realized the optimization in schedule, cost and quality.<\/p>\n<\/div>\n<\/div>\n\n\n\n<h6 class=\"wp-block-heading\" id=\"block-7bd3d215-4438-4e26-8f1b-498eb3fb7544\">For those who are considering investment in factory construction of factories in Malaysia, Indonesia, and Vietnam,<\/h6>\n\n\n\n<h6 class=\"wp-block-heading\" id=\"block-7bd3d215-4438-4e26-8f1b-498eb3fb7544\"><strong><span class=\"has-inline-color has-vivid-cyan-blue-color\"><strong>Please feel free to contact us if you have any questions about construction projects or our services.<\/strong><\/span><\/strong><\/h6>\n\n\n\n<h6 class=\"wp-block-heading\" id=\"block-0c2c1890-2744-464e-bd19-61ca43a431f1\">In addition to factories, we handle all kinds of construction projects, including logistics warehouses, commercial facilities, condominium construction, and hotels etc. We also provide construction consulting services for overall construction investment and construction investment in general.<\/h6>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"http:\/\/staging.plus-pm.com\/en\/contact\/\" target=\"_blank\" rel=\"noopener\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"401\" src=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam-1024x401.png\" alt=\"Industrial and Factory Construction and Project management\uff5c For Malaysia, Indonesia, and Vietnam\" class=\"wp-image-16826\" srcset=\"http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam-1024x401.png 1024w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam-300x118.png 300w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam-768x301.png 768w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam-1536x602.png 1536w, http:\/\/staging.plus-pm.com\/wp-content\/uploads\/2021\/07\/Industrial-and-Factory-Construction-and-Project-management\uff5c-For-Malaysia-Indonesia-and-Vietnam-2048x802.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<hr class=\"wp-block-separator\" id=\"block-740e9ffd-5bda-40aa-8c97-e541a05d7363\"\/>\n\n\n\n<p id=\"block-9045ea0f-92b7-4030-a5a1-b527bd50f1f5\">\u226bReference<\/p>\n\n\n\n<p><a href=\"https:\/\/www.jetro.go.jp\/world\/asia\/my\/\" target=\"_blank\" rel=\"noreferrer noopener\">JETRO MALAYSIA<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>You may have these concerns about factory\u2026 \u201cHow to harmonize factory design and production process\u201d \u201cHow to optimize workflow and improve productivity\u201d \u201cHow to have a safe factory\u201d \u201cBeing concerned about long-term planning\u201d These are the major issues in construction of factories. Many companies entering the ASEAN market and build their factories for a variety [&hellip;]<\/p>\n","protected":false},"author":18,"featured_media":16831,"parent":0,"template":"","blog-category":[65,64],"class_list":["post-16792","blog","type-blog","status-publish","has-post-thumbnail","hentry","blog-category-construction","blog-category-investments-tax"],"_links":{"self":[{"href":"http:\/\/staging.plus-pm.com\/en\/wp-json\/wp\/v2\/blog\/16792","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/staging.plus-pm.com\/en\/wp-json\/wp\/v2\/blog"}],"about":[{"href":"http:\/\/staging.plus-pm.com\/en\/wp-json\/wp\/v2\/types\/blog"}],"author":[{"embeddable":true,"href":"http:\/\/staging.plus-pm.com\/en\/wp-json\/wp\/v2\/users\/18"}],"version-history":[{"count":0,"href":"http:\/\/staging.plus-pm.com\/en\/wp-json\/wp\/v2\/blog\/16792\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/staging.plus-pm.com\/en\/wp-json\/wp\/v2\/media\/16831"}],"wp:attachment":[{"href":"http:\/\/staging.plus-pm.com\/en\/wp-json\/wp\/v2\/media?parent=16792"}],"wp:term":[{"taxonomy":"blog-category","embeddable":true,"href":"http:\/\/staging.plus-pm.com\/en\/wp-json\/wp\/v2\/blog-category?post=16792"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}